Start with the property, not the catalogue

Send a floor plan if you have one, photos and a short description of how the home will be used. Include whether it is a permanent home, a holiday property or a rental, and tell the designer what needs to stay.

Early photographs and dimensions are useful for exploring options; final dimensions must be checked on site before manufacturing.

Know what the quote covers

Ask whether the quotation includes cabinets, panels, handles, worktops, appliances, delivery, fitting and VAT. Demolition, plumbing, electrical changes and waste removal may be separate services.

Agree who is responsible for each trade and what happens if the planned layout requires additional work.

Arrange access and decisions

If you are not in Spain, decide who can open the property for measuring and delivery. Tell your designer whether they can contact your property manager, builder or representative.

Keep approvals in writing: layout, appliance models, finishes, price, payment stages and expected delivery window.

Understand the installation sequence

The furniture is generally fitted first, then a stone or porcelain worktop is measured on site and manufactured to fit. Final appliance and sink connections follow as the works allow.

Build some flexibility into travel dates: factory lead times, worktop production and unforeseen site issues can change the schedule.

How COSTAHAUS works with overseas owners

We can start with a remote discussion, review an initial design in English, and arrange site measurement and sample review when access is possible. Once the proposal is agreed, we coordinate kitchen supply and local fitting.

If you only need drawings and 3D views, that is also available as a separate online design service; it is not a mandatory charge for discussing a complete kitchen project.